gh2-sim
drag background to pan⌘/Ctrl+wheel zoomclick edge to delete
LCOH
—
Margin
—
Capex
—
Payback
—
Output
—
Stack CF
—
START HERE

1 MW alkaline solar-H₂ (Kutch)

2.5 MW solar → rectifier → 1 MW alkaline stack, DM water in from above, then buffer, compression and mobility offtake. Lands near the CEEW LCOH band once prices are set.

You'll place a 1 MW alkaline electrolyzer first and see its equipment envelope, then feed it water and power and finish compression and offtake. Live LCOH and carbon intensity unlock when the path is complete.

gh2-sim
10 Oct 2026

Empty canvas

India-calibrated green hydrogen simulator

Incomplete plant — CAPEX estimate only. Wire power → rectifier → electrolyzer → compressor → offtake for live LCOH and carbon intensity.

Plant sheet

Assumptions

Electrolyzer islandmarket default · default
RE tarifffrom mix · default
Grid tariffcatalogue default · default
RE ownershipppa · set
Supply regionasia · set
Imported equipment100% · set

Checks